Measurement of the production performance through the comparison between the budgeted and the actually achieved time: a Case Study

Autores

  • Fábio Henrique Antunes Vieira FAIT
  • Cristian Dekkers Kremer UTFPR
  • Antonio Carlos de Francisco UTFPR

Resumo

This article aims to present a statistical study utilized for the verification and performance measurement regarding the used labor time for the achievement of the metallurgic production process in an industry of this segment, located in Castro, Paraná State. The work demonstrates a comparative study between the budgeted and the actually achieved time, presenting as well, the advantages and objectives that can be realized through the performance and productivity measurement. According to the results, the possibility of improvement in processing time could be verified, reducing the hand labor costs and increasing the competitiveness of the company.

Downloads

Publicado

16-07-2019

Como Citar

VIEIRA, F. H. A.; KREMER, C. D.; DE FRANCISCO, A. C. Measurement of the production performance through the comparison between the budgeted and the actually achieved time: a Case Study. Revista ADMPG, [S. l.], v. 2, n. 2, 2019. Disponível em: https://revistas.uepg.br/index.php/admpg/article/view/13904. Acesso em: 21 nov. 2024.

Edição

Seção

Artigos

Artigos mais lidos pelo mesmo(s) autor(es)